A data centre has been operating at Alajaama tee 1 in Hüüru, Harju County, since 2022. It is now being upgraded so AI computing equipment can be installed inside it. This page lists what is documented in public sources, and separately what is not.

31.5 MW
total campus power[3]
14,500 m²
floor area, two levels[3]
2022
year the facility opened[4]
€200M
investment target by end of 2026[2]

01The facility

What the operator publishes about the building.

Location Alajaama tee 1 76911 Hüüru küla, Saue vald, Harju County, west of Tallinn.[3]
Legal entity MCF Group Estonia OÜ Trading as Greenergy Data Centers. Registry code 14069314.[3]
Campus power 31.5 MW Stated as total complex power for the site.[3][4]
Floor area 14,500 m² Flexibly sized data rooms across two floors, described as roughly two football pitches.[4]
Efficiency Target PUE under 1.2 Described as around 25% more efficient than the sector average.[3][4]
Energy 100% renewable The operator states the facility runs entirely on renewable energy.[3][4]
Resilience EN 50600 Level 3/4 Duplicated cooling systems, and 100% uptime reported since opening.[3]
Fire prevention Oxygen reduction A system that lowers oxygen levels in the server rooms so fire cannot start, described as the first of its kind in Estonia.[4]
Neutrality Carrier and cloud neutral Customers choose their own network carriers and cloud providers.[3][4]
Certification EN 50600, PCI DSS, ISO Reported as the only data centre in the Baltics and Finland holding the European EN 50600 certificate.[3][4]

02The AI upgrade

About €200 million, spent mostly inside a building that already exists.

2022
The facility opens
Greenergy Data Centers begins operating at Hüüru, described as the largest and most energy efficient data centre in the Baltic region. The Three Seas Initiative Investment Fund supported the original build.[4]
31.5 MW
28 July 2026
Tensor Estate becomes a shareholderRecent
MCF Group Estonia welcomes Tensor Estate as a minority shareholder. A joint supervisory board is formed with representatives of both owners. The capital is described as expansion capital for AI demand.[5]
Minority stake
In progress
Fitting out for AI
The programme develops additional space inside the existing building rather than relying on a new site. Miko Niinemäe, head of Tensor Estate, said AI requires somewhat different infrastructure than what was already there.[2][6]
Over €70m invested
End of 2026
Investment target
Total investment approaching €200 million, with close to €100 million coming from Estonian entrepreneurs.[2][6]
About €200m

03Who owns it

Two shareholders, one supervisory board.

Correction we made

Some coverage describes Tensor Estate as the company that owns the data centre. The shareholder announcement is more precise: Tensor Estate is a minority shareholder in MCF Group Estonia, and the Three Seas Initiative Investment Fund remains the majority shareholder.[5] We corrected an earlier version of this page that repeated the looser wording.

Majority shareholder
3SIIF
The Three Seas Initiative Investment Fund S.A. SICAV-RAIF, described as remaining fully committed to the company.[5]
Minority shareholder
Tensor Estate
Joined 28 July 2026, providing expansion capital for AI demand. Also develops separate greenfield sites in Estonia.[1][5]
Operating company
MCF Group Estonia
Owns and operates the facility, trading as Greenergy Data Centers.[3][5]
Governance
Joint board
A joint supervisory board was established with representatives of both 3SIIF and Tensor Estate.[5]

Named people

Miko Niinemäe is head of Tensor Estate. Martin Rungi heads the key accounts segment at Greenergy Data Centers. Urvo Männama is a partner at Tensor Aurora.[2][6] Kert Evert is founder and chief development officer of Greenergy Data Centers, and Tõnu Grünberg is chief executive.[4]

Estonian investors named in reporting

Kristjan Rahu Jüri Käo Enn Kunila Markus Villig Urvo Männama

Reported as the entrepreneurs behind close to €100 million of the funding.[2][6]

04The honest part

What is not public, and what we refuse to guess.

A lot of coverage fills these gaps with plausible sounding detail. We checked each of the following and found no public source, so the answer here is simply that it is not known.

?

How much of the 31.5 MW is for AI

The 31.5 MW figure covers the whole campus and predates the AI programme. No public source states how many megawatts the AI upgrade will make available.

?

Which chips will be installed

No vendor, model or quantity of GPUs has been announced. Reporting refers only to enabling AI computing capacity to be installed.[2]

?

Whether liquid cooling is installed

The operator describes duplicated cooling systems but does not specify direct liquid cooling.[3] Given AI rack densities, this is a reasonable question to ask, and we have no answer.

?

Whether waste heat is reused

Heat reuse into district heating is cited as an Estonian opportunity in general.[1][17] We found no public confirmation that this site does it today.

?

Phase capacity

Third party data centre registries list a first phase of around 7 MW of IT power.[16] The operator does not publish this, so treat it as unconfirmed.

?

Customers and pricing

Customers are described only as primarily Estonian so far, with the expansion aimed at international ones.[2] No names, contracts or prices are public.

05The country case

Why anyone would build this in Estonia.

The figures below are published by Tensor Estate, a party with an interest in the answer. We list them as their claims rather than as neutral findings.[1]

0%
corporate tax on reinvested profits[1]
PLI 75
construction price level, 25% below the EU average. Up to 41% cheaper than Sweden, 34.6% below the Frankfurt, Amsterdam, Paris and Dublin markets[1]
35%
lower average power price than leading EU markets, with direct Nord Pool day-ahead and intraday access[1]
68% / 41%
renewables as a share of Estonian electricity production, against 41% of consumption, in 2025[18]
Read that last number carefully

Tensor Estate presents Estonia as 70% renewable.[1] That figure describes what the country generates. Elering, the grid operator, puts renewables at 68% of production but only 41% of consumption for 2025, because Estonia imports a large share of the electricity it uses.[18] For a data centre the consumption figure is the honest one, unless the site buys renewable supply under contract. Greenergy states its own supply is 100% renewable, which is a separate commitment from the national grid mix.[3]

#1 OECD Tax Competitiveness Index 2024 #1 in the EU, Global Cybersecurity Index #8 Index of Economic Freedom 2024 < 3 ms Tallinn to Helsinki 3.43% of GDP to defence, 2nd in NATO after Poland NATO CCDCOE cyber defence centre, in Tallinn eu-LISA EU border systems agency, hosted in Estonia
A grid change worth knowing about

On 8 February 2025 the Baltic states disconnected from the Russian-controlled BRELL power system, and the next day they synchronised with the Continental European grid. The switch happened without blackouts.[19] For anyone weighing a long-term power contract in Estonia, this is the single largest change to the country's electricity picture in decades, and it happened after most published comparisons were written.

Estonia is a member of both the European Union and NATO. Tensor Estate also states that on a 100 MW facility the construction cost difference alone is worth €50 to 80 million against Nordic markets, and attributes its construction figures to Eurostat price level indices for 2024 and its defence figures to the NATO Defence Expenditure Report 2024.[1]